GOLDAIR HANDLING ENGINE PLANT

PREPARATIONS & CONSTRUCTION WORKS OF INDUSTRIAL FLOOR WITH EPOXY PAINTING IN THE AREA OF THE ENGINE PLANT OF GOLDAIR HANDLING AT THESSALONIKI AIRPORT

STUDY-SUPERVISION-CONSTRUCTION: BIGDELIS STELIOS, XYPTERAS STRATIS

 

Construction of rigid reinforced floor, industrial type, surface hardening with the application of a mixture of quartz aggregates, consisting of C20/25 category concrete, small thickness, reinforced with T131 mesh and 18mm polypropylene fibers.

Application of special epoxy two-component dispersion paint, which meets the specifications for its application on freshly concreted floor with excellent results in mechanical stress. The above paint is of Swiss technology, acquires passability in 12h from its application, complete hardening in 5 days and final strength in 14 days. For the outer part of the floor to protect the final layer, transparent polyurethane paint was applied, to protect from ultraviolet radiation.

INITIAL CONSTRUCTION – CONSTRUCTION PHASES

 
Construction planning and supervision 
of all types of construction and electromechanical projects. Complete constructions,
reconstructions and renovations of construction and technical works,
residential and commercial spaces. Specialized proposals and
coordination of technical projects

Copyright © 2021 Northbuild. All Rights Reserved.

Proudly Powered By Ioannis Xypteras (LinkedIn) & Sofia Kordonouri (https://sites.google.com/view/skordonouri)